Hiroe (hiroe) wrote in metalsmiths,
Hiroe
hiroe
metalsmiths

Double-slip installation.

I've spent about two days building, installing, and finishing this:











Click for hueg:



While the glue was drying on the ballast, i also got an 8' piece of the passenger station platform cut and installed:



I've found that the best way to get clean edges on the platform and that match the track curvature is to cut it oversize, then use a dremel mounted on a freight car underframe to trim the edges with a router bit:
  • Post a new comment

    Error

    default userpic
  • 2 comments